Rangers working with Trackcare to install toilet on the Canning Stock Route
Kunawarritji rangers worked with the energetic volunteers of Trackcare to build a toilet at Well 33. Last season, the Kunawarritji rangers had decided on the proposed location: high ground north of the well.
Before the Trackcare crew arrived, the rangers cleared the site and filled a trailer with gravel ready to concrete the posts in.
Des and the other Trackcare volunteers didn’t muck around, knocking up the steel structure in just two days. The rangers got into it as well, helping dig the post holes (into calcrete), putting the frame together, knocking up and pouring the concrete, screwing on roof sheets and pushing through a track (to the waste site) with the tractor blade.
Rawa school kids helped finish off the toilet by painting a mural on it.
On completion of the job, rangers thanked the Trackcare crew by presenting them with KJ information packs about the Canning Stock Route and Martu culture.